On-site installation qualification (IQ), operational qualification (OQ) and performance qualification (PQ). Available for GridION, PromethION 24 and PromethION 48.
Installation qualification (IQ) Validation process to ensure the device has been successfully delivered and installed.
Correct delivery of device(s)
- Suitable device location
- Adequate electrical supply
- Acceptable environmental and safety conditions
- Appropriate connection to device peripherals
- Operational qualification (OQ) Validation process testing the operation of the system as being able to complete the hardware check.
Correct electrical operation
Functional internet connection, network settings, and system setup
Hardware check to validate correct operation of all flow cell positions and software
Performance qualification (PQ) Validation process testing the performance of the system.
Run a Lambda control experiment to assess device performance. Recommended on initial setup and after significant changes (e.g. software update, implementing automation, new technician onboarding)
Check reagents, instrument, flow cell, and software performance